Follow us :

steel plank

steel plank
steel planksteel planksteel plank
group name
Metal Plank
Min Order
1 piece
brand name
Youfa Steel Pipe Manufacturer
Nearest port for product export
Tianjin Port, Shanghai Port,etc.
Delivery clauses under the trade mode
FOB, CFR, CIF, EXW
Acceptable payment methods
T/T, L/C, D/P D/A
update time
Wed, 04 Dec 2024 00:47:09 GMT

Paramtents

  • surface treatment pre galvanized

Packging & Delivery

  • Min Order1 piece

Briefing

225 mm 320 mm Steel Plank w/o hook | Metal Walk Board for scaffolding platform in Construction 1000mm length 210mm width

Detailed

Steel plank specification:

Size/mm

Length/mm

Width/mm

Height/mm

Kg/pc

210*45*1.2

4000

210

45

13.6

210*45*1.2

3000

210

45

10.26

210*45*1.2

2000

210

45

6.93

210*45*1.2

1000

210

45

3.59

225*38*1.2

4000

225

38

13.6

225*38*1.2

3000

225

38

10.26

225*38*1.2

2000

225

38

6.93

230*60*1.8

2500

230

60

16.5

240*45*1.2

4000

240

45

14.87

240*45*1.2

3000

240

45

11.23

240*45*1.2

2000

240

45

7.59

240*45*1.2

1000

240

45

3.94

250*50*1.2

4000

250

50

15.67

250*50*1.2

3000

250

50

11.84

250*50*1.2

2000

250

50

8

250*50*1.2

1000

250

50

4.15

 

Steel plank with hook

Size/mm

Length/mm

Width/mm

Height/mm

Kg/pc

500*50*1.2

1829

500

50

15.5

480*45*1.2

1829

480

45

13.5

450*45*1.2

1829

450

45

13

500*50*1.2

1219

500

50

12.5

480*45*1.2

1219

480

45

11

450*45*1.2

1219

450

45

10

420*45*1.2

1219

420

45

9.5

450*38*1.2

1219

450

38

12.5

420*45*1.2

1219

420

45

9

330*50*1.2

1219

330

50

9

330*50*1.2

1219

330

50

8.5

330*50*1.2

1829

330

50

11.5

Steel Plank Features:

1) A larger capacity
When the scaffolding geometry and structure is compliant with the relevant requirements,
the general single-tube column scaffold bears capacity of up to 15kN ~ 35kN (1.5tf ~ 3.5tf, design value).

2) Easy disassembly, erection and flexible
Easy to adjust the length of the tube, fastener connection is simple,
and thus can adapt to all kinds of plane, elevation of buildings and structures with the scaffold.

3) To compare the economy
Processing is simple, a relatively low investment costs; if well-designed scaffolding geometry, focus on improving working capital utilization rate of steel, the material consumption can be achieved better economic results. Fastening steel frame construction steel per square meter equivalent to about 15 kg.

Glavanized steel walk board steel plank

Various uses: 1. Used for building, hall, bridge, viaduct, tunnel and other formwork inside the top or as the main frame of the flying mold support. 2. Make the internal and external grid scaffolding of high-rise buildings. 3. Working platform for mechanical and electrical installation, ship hull repair and other decoration works. 4. Gateway scaffolding with simple roof trusses can be used to form temporary site dormitories, warehouses or barracks. 5. Temporary viewing platform and stands for the tower.
Packing:


Other related Products: